熟女熟妇人妻在线视频

<center id="fzrld"><menu id="fzrld"></menu></center>
<code id="fzrld"><em id="fzrld"></em></code>
    <big id="fzrld"><nobr id="fzrld"></nobr></big>

      project

      PRODUCTS SERVICE & SPARE PARTS PROJECTS ABOUT TRUEMAX CONTACT US
      Home >  project >  Concrete Machinery >  DOHA METRO-GREEN LINE
      project

      DOHA METRO-GREEN LINE

      Adding time: 2019.08.30

      Share
      Concrete Placing Boom in Malaysia

      Project Description:

      Total construction mileage 300km include 100 stations, which has both underground lines and elevated lines

      The project’s D&B contract of the Green line underground project has been given to a JV led by PORR Bau, Saudi Bin Laden Group and Hamad Bin Khalid Contracting.


      Truemax Solutions:

      Total concrete equipments solution and accessory. Included the mixer, mold, gantry crane, pumping, placing, galvanize steel walk way etc.    


      Job Site: Qatar


      熟女熟妇人妻在线视频

      <center id="fzrld"><menu id="fzrld"></menu></center>
      <code id="fzrld"><em id="fzrld"></em></code>
        <big id="fzrld"><nobr id="fzrld"></nobr></big>